Client: AIOC (Azerbaijan International Operating Company)/BP Exploration.
Independent Technical Audit for installation onto the main Central Azeri Platform a DES and DSM module each up to 1200Te, using 4 cranes to raise each module then crawl approximately 20m and lift approximately 15m to above the installation level. Crawl again 10m with 4 cranes and land each module’s leading edge on the platform, remove the leading 2 cranes and subsequently skid each module, while crawling with 2 cranes the remaining 25m suspending the rear of each module.
Client: AIOC (Azerbaijan International Operating Company)/BP Exploration.
Independent Technical Audit for installation onto the main Central Azeri Platform a DES and DSM module each up to 1200Te, using 4 cranes to raise each module then crawl approximately 20m and lift approximately 15m to above the installation level. Crawl again 10m with 4 cranes and land each module’s leading edge on the platform, remove the leading 2 cranes and subsequently skid each module, while crawling with 2 cranes the remaining 25m suspending the rear of each module.