Client: Formosa Heavy Industries Corporation.
Conceptual and detailed design of a 1100Te SWL twin tower modular jacking tower system, incorporating strand jacks, for the erection of numerous process vessels up to 100m high. The tower system was designed to operate unguyed for towers up to 37m high and to be supported on a skid track for relocation between operating positions without the need for dismantling and re-erection.
Client: Formosa Heavy Industries Corporation.
Conceptual and detailed design of a 1100Te SWL twin tower modular jacking tower system, incorporating strand jacks, for the erection of numerous process vessels up to 100m high. The tower system was designed to operate unguyed for towers up to 37m high and to be supported on a skid track for relocation between operating positions without the need for dismantling and re-erection.